Mission Critical
Reston, VA
Confidential Colocation Data Center
Data hall electrical retrofit — 6.4MW colocation upgrade with future-ready liquid cooling infrastructure
Electrical upgrades to allow for colocation ILO sole tenant use in two data halls, totaling 27,000 SF, with a total connected load of 6.4MW. Includes upgrade of PDUs, RPP, and additional redundancy for the CHW system to accommodate future liquid cooling capabilities.


